BeaverFlow

See what every go-live decision rests on

Release managers see which checks have passed and which wave comes next. The release record keeps every approval and promotion between environments.

Who it’s for

Release managers, change approvers and the on-duty production engineer

The everyday situation

Before a deployment, two teams answer different questions: is the version ready, and can the service change right now? With the test result, the window and the decision in one place, the duty engineer knows why it got the go-ahead.

Your 14-day trial

Make the go-live call before the window closes

Try this

Prepare a release candidate with its change, the staging result and a rollback owner. Then rehearse what you’d decide if the last critical test misses the window.

How you’ll know it works

A duty engineer from outside the release team should be able to tell which version was approved, who made the call and when to roll back.

Notify me

In practice

The decision that has to be made at 2 a.m.

Deployments rarely fail because of bad code. They fail because at the critical moment nobody knows what “ready” means, who can say “go” or what to do if it goes wrong.

Release puts those answers on one record before the window opens: what was tested and on which version, who approved it, which wave goes first and, most important of all, the exact condition for rolling back and who makes that call.

With that written down, the engineer on duty isn’t guessing. They’re following a plan the whole team agreed in daylight. In the trial, prepare one small release and rehearse the moment when a test fails ten minutes before the window.

Product capabilities

Before moving from test to production, review readiness, test results and approvals. Deployment waves show which part of the release has passed its quality gate.

If you need to roll back, the plan is right there on the release. At the review afterwards, the calendar and records let you replay the decisions in order.

What you work with every day

Release planning

Plan each release with scope, schedule, target environments, linked changes and an owner.

Deployment history

What went out, when, by whom, where and how it went, all linked to the release plan.

Staged approvals

Approval gates at the points you choose, with CAB sign-off required before production.

Rollback plans

Every release has a written rollback plan, ready the moment a deployment needs reversing.

Changes in the release

Every change in scope is linked to the release, with its approval status in one place.

Release calendar

One calendar of planned releases across every environment, so deployments don’t collide.

Where it leads next

Test Management · Testing and quality

Check the latest run for the candidate version before approving its production window.