BeaverFlow

Infrastructure and delivery engineers

Decide whether a capacity alert is worth a production change

Weigh a change before it hits production. Follow it back to the original signal, the affected configuration, the tests and how the rollout is going.

Notify me

A week in your shoes

An alert at four on Friday afternoon

Disk usage on a storage host crosses 85%. Is that a problem for today, for next month or not at all? If you react to every alert, you’ll spend your life making changes on Friday afternoons. If you ignore them, one day you’ll be right in the middle of an outage.

The answer depends on things the alert doesn’t tell you. What runs on that host? Is the trend steady or was it one big file? How long would it take to add capacity?

BeaverFlow puts those answers next to the alert. Monitoring says what happened, CMDB says who depends on it and Capacity says where the trend is going. You decide once, with the facts in front of you, and the change you make has a reason attached.

Why these products work together

Monitoring records what the host reported. CMDB shows which services depend on it. Capacity tells a real trend from a short spike. Put together, that tells the duty team whether a change is worth it.

When to go further

Add Test Management for the verification run, Release for the maintenance window, DevOps for the build and Automation for an approved routine job.

How to check the result in 14 days

  1. Days 1–3

    Pick a storage pool, the host that monitors it and one service that depends on it. Agree the threshold and how long an expansion takes.

  2. Days 4–10

    Follow a sample event through CMDB. Compare the demand history with the threshold and ask the service owner what an outage would hit.

  3. Days 11–14

    Have a second engineer choose between watching and expanding. Their note should name the affected service, the trend behind it and the latest sensible date to decide.

Notify me