BeaverFlow

Know exactly which build passed the critical test

Before a release, compare the test plan with what actually ran and the defects still open. Acceptance tests give you the evidence for the release gate.

Who it’s for

QA leads, test engineers and release approvers

The everyday situation

A green run only counts when the reviewer knows which version it covers. Keep the scenario, the result and the retest on the release, so the approver can judge the risk that’s left.

Your 14-day trial

Prove the failing scenario passed on the release candidate

Try this

Run a critical user journey against a candidate version. Keep the failed result, link the fix and run the same scenario again on the new build.

How you’ll know it works

Give the release approver both runs. They should be able to name the build that was tested, what changed and which open result still affects approval.

Notify me

In practice

“It passed” is not the whole sentence

A release is waiting for approval. Someone says the tests passed. Which tests? On which build? In which environment? Before or after yesterday’s fix? The room goes quiet.

Test Management keeps the plan, the runs and the results together, tied to the exact version that was tested. A failed run links to its defect, and the rerun shows what changed.

The person approving the release gets a straight answer: this build, these scenarios, these open issues. In the trial, run one critical user journey, let it fail, fix it and run it again.

Product capabilities

At a release gate, bring together the plan, the run results and the open defects. Say which environment you tested in, so reviewers know the conditions behind each scenario.

The release owner compares the acceptance criteria with what actually happened. On a retest, the team reopens the same test case and sees what changed.

Where it leads next

Release · Release management

At the approval gate, hand the release owner the tested build and the scenarios that are still open.