Implementation story
When the warehouse loses its WMS
Handhelds stop getting picking tasks, and calls about the same outage come in from every corner of the warehouse. Here's how a shift lead keeps it to one incident and gets the trucks moving again.
Notify meAt 05:40 the handheld scanners at a distribution warehouse go quiet. No new picking tasks. The operators do what anyone would: they call IT. All of them. Within ten minutes the service desk has fourteen tickets about what is obviously one problem, three of them marked urgent, and one that just says "nothing works".
Meanwhile, the first trucks are due at seven.
The real problem wasn't the outage
Systems fail. What made mornings like this painful was everything around the failure. Fourteen tickets meant fourteen engineers could, in theory, start investigating. Nobody knew who was in charge. The shift lead on the floor heard three different versions of when it would be fixed. And when the scanners finally came back, nobody could say whether it was thanks to the database restart or in spite of it.
So the warehouse didn't start by buying a better WMS. It started with one shift, one service and a simple rule: one outage, one incident.
One shift, one service
The team picked order picking on the morning shift. An engineer mapped the WMS gateway and its database in CMDB, which took an afternoon. The more important job fell to the service owner, who went through each dependency and asked an unglamorous question: is there a person the shift lead can actually reach at 05:40? Twice, the honest answer was no. Those two contacts got fixed before anything else.
From the help desk back to the loading bay
The next time the scanners went quiet, it played out differently. The desk opened a single WMS incident in ITSM and linked every new call to it. Callers heard "we know, it's being worked on, next update at six". The on-call engineer followed the map upstream, found the gateway and posted an update on the status page, so the floor stopped phoning.
The fix counted only when a warehouse operator scanned a real order and the picking task came through.
That last step was the big change. A green light on a server is the engineer's view of recovery. A pallet moving is the warehouse's view. Only the second one gets trucks loaded.
What the next shift inherits
By handover, the afternoon shift had one status update and one person to escalate to. The incident kept its timeline and the operator's confirmation. And a short article in Knowledge described the first diagnostic step with a link to the service, so the next outage doesn't start from zero.
Try it yourself in 14 days
- Days 1–3. Pick one shift, one scanner and one order. Note the last picking step that worked and who will confirm the recovery.
- Days 4–10. Interrupt a pick on purpose, log a second report and pass the open incident to the next engineer. Update the service status before the operator tries again.
- Days 11–14. Ask the shift lead to rebuild what happened from the record alone, including the operator's confirmation and the last update. A server that answers ping doesn't close this.
If the shift lead can retell the morning from the record, you're ready to add the second shift.
Be among the first on BeaverFlow
Registration opens on 20 December 2026. Leave your email and we’ll tell you the moment you can sign up.