
Tie a risk decision to the latest control test
Follow a requirement from the standard to its control, the test result and the accepted evidence. Give audit findings an owner and a due date, so you can show they were really closed.
Who it’s for
Risk owners, control testers and internal audit
The everyday situation
A repeat control test needs fresh evidence. The previous result, the linked risk and the next review date let the reviewer see what’s changed since the last decision.

Your 14-day trial
Show that a control still works after a change
Try this
Pick one control linked to a known risk. Have its owner attach fresh evidence, then ask someone else to test it and set the next review date.
How you’ll know it works
Hand the sample to an internal reviewer. They should be able to follow the risk, the control owner, the latest test and anything still waiting to be fixed.
Notify meIn practice
“We have a policy for that” is not evidence
An auditor asks how you know a control works. The policy is on the intranet. The last test was, everyone thinks, in spring. The person who ran it has moved teams.
GRC connects the pieces: a requirement, the risk it addresses, the control that reduces the risk, the test that shows the control works and the evidence someone accepted. If a test fails, the finding gets an owner and a date, and it stays visible until it’s retested.
You end up with a chain you can walk in either direction, in front of anyone. Start with one control and one risk, and ask a colleague to test it.
Product capabilities
Choose a requirement and look at the controls linked to it. When a test shows a gap, record the finding, who will fix it and when you’ll test again.
At a surveillance audit, open the original finding and the proof it was closed. The record takes the auditor from the risk you found to the fix you verified.
- Risk and business continuity records
- Requirements and regulatory obligations
- Controls, policies and evidence
- Audits, findings and remediation plans


Where it leads next
Security · Information security
If a control fails, follow its corrective action to the affected asset and the retest.